Purpose-built for railroads, rail transit, and PTC-supporting environments

Configuration control for rail operations, built with
PTC and FRA accountability in mind.

Veltric CMIS gives rail organizations a practical way to manage assets, service issues, and change activity in one connected system. Track what you own, what changed, what failed, and what was approved across critical railroad systems without relying on disconnected spreadsheets, ticket queues, and ad hoc logs.

Rail-focused asset records Ticket workflow tied to field equipment Change governance aligned to PTC oversight
Veltric CMIS
Rail configuration management and operational control
Managed Assets
12,480
Open Tickets
86
Pending CRs
14
Rail Operations Activity Live View

Ticket #2487 linked to WIU-031

Communications loss alarm reported and routed for investigation
Critical

CR-117 awaiting board approval

Back-office firewall update with rollback plan and implementation window
Review

Asset audit completed on OCC-SVR-02

Configuration baseline updated and attachment history preserved
Logged
Workflow Health
Tickets triaged89%
Asset linkage94%
CR documentation97%
Parent company

Veltric CMIS is a product of DG Strategies.

DG Strategies provides rail, systems, and technology consulting focused on operational environments where control, traceability, and execution matter. Veltric CMIS extends that same discipline into a purpose-built software platform for railroad asset management, ticketing, and governed change.

Visit DG Strategies

Purpose-built for railroad operational environments

Veltric CMIS is designed for agencies and operators that need a tighter connection between configuration control, issue response, and governed change activity across railroad systems and supporting infrastructure.

Rail asset and configuration management

Maintain structured records for PTC assets, onboard systems, wayside equipment, back-office infrastructure, documentation, ownership, hierarchy, audit details, and attachment history.

Integrated ticketing

Capture incidents, alarms, and support issues, assign work, track escalation, and tie every ticket back to the affected railroad asset or environment.

Change request control

Document risk, approvals, implementation steps, rollback plans, and closure activity so operational and technical changes are governed end to end.

Cross-linked records

See the relationships between assets, tickets, and change requests without reconstructing history across multiple disconnected systems.

Attachments and evidence

Store screenshots, field reports, procedures, approvals, and supporting files directly on the records where work happens.

Reporting that supports oversight

Give technical teams and leadership a clearer view of workload, change activity, asset history, and operational readiness.

Built for railroads, with FRA-conscious support for PTC environments

Veltric CMIS is not a generic IT help desk dressed up for rail. It is positioned for organizations that need tighter discipline around Positive Train Control support, system baselines, issue traceability, and change documentation in environments where uptime, accountability, and auditability matter.

Discuss Your Environment

Where the rail focus shows up

The product story is strongest when it explains why railroad organizations need something more structured than a general-purpose ticketing platform.

PTC-supporting traceability

Keep asset history, issue history, approvals, and implementation details connected so teams can more easily understand what changed and why.

FRA-facing accountability

Support more disciplined documentation and operational governance for environments where regulator confidence and internal control matter.

Rail-specific operational context

Model field equipment, back-office assets, and operational records in a way that fits railroad workflows rather than forcing them into generic IT categories.

Ready to see how Veltric CMIS could fit your railroad or rail transit environment?

Use the form below to request a conversation, schedule a demo, or share a few details about your systems and compliance priorities.

What to expect

We’ll start by understanding your railroad environment — including:

  • PTC Systems
  • Wayside and Onboard Assets
  • Operational Workflows

From there, we’ll demonstrate how Veltric CMIS supports traceability, change control, and FRA-conscious operational oversight.

Update the destination email in contact_handler.php before deploying.